OutDo OutDo
Est. 2018 · Pune, India

The manufacturing partner behind your project.

Manufacturing capacity, technology and execution for architects, turnkey firms and project partners who need their projects delivered as planned.

26,000Sq ft manufacturing facility
2Production lines
2Shifts
80+In-house team
500+Office spaces delivered
Why it matters

Your furniture manufacturer can affect more than your furniture

In an office fit-out, furniture is a project inside your project. A delay at one stage can move everything that follows—including your handover date.

Tap a stage to see what a slip there moves.

Before furniture reaches site

What usually goes wrong before furniture reaches site?

Three problems that can quietly move a project off schedule—and each can often be caught before a single panel is cut.

Problem

The site changed after the layout was drawn

A partition moves. The client asks for changes on site. The furniture drawings still show the old sizes.

Consequence

Furniture that does not fit

A cabin drawn at 10 ft is 7 ft on site. What was made for it is made again, and the days and material are lost.

Ask any vendor: when did you last see the site, and who went?

Problem

The approved colour is not in stock

A distributor rarely holds more than about 100 sheets of one colour. A job above about ₹15–20 lakh often needs more.

Consequence

About two weeks lost on board alone

The board is made to order at the mill, adding about 12–15 days, often discovered after the colour is approved.

Ask any vendor: how many sheets of this colour does the job need, and who can supply them?

Problem

Switch-plate cutouts were never collected

The electrician and the furniture maker work from different drawings, and nobody asks for the cutout sizes.

Consequence

Found on site, or on hold mid-production

The missing cutout is found after delivery, or production stops for one to two days while the details are chased.

Ask any vendor: do you have the switch-plate details for every desk that needs one?

The OutDo answer

Built differently at every stage

Six systems designed to reduce the manufacturing risks that can push a project off schedule.

Drawing · Material

Planning

A dedicated designer and project manager on every order. The real site is checked and the drawings corrected before production, and the laminate mill is asked to hold its slot early.

Production

Capacity

About 26,000 sq ft in three units: woodwork, metal and e-commerce. Two production lines, two shifts, 7 AM to 2 AM.

Production

Technology

Spazio 3D software turns approved drawings into cut lists, machine programs and a label for every panel. Nothing depends on memory.

Every stage

Production control

About 120 tasks per project, each with an owner and a deadline, on a daily scorecard. You see the current stage with one WhatsApp message.

Production · Dispatch

Quality

Wood, metal and aluminium made in one factory to one standard. Cleaned and checked on the floor before packing. ISO 9001:2015.

Dispatch · Installation

Delivery

Site readiness, lift and labour confirmed before the truck leaves. Packed per project, per floor, with safety kit carried for MNC sites.

Proof

Don't take our word for it

Real projects, real quantities, real complexity, and a factory you can walk through.

View all projects

OutDo furniture is installed at these companies

Some delivered directly, some through the architects and turnkey firms who chose us.

Atlas CopcoChicago PneumaticEFCTunwal E-MotorsGodavari BankNMIETSKFEmerson

Real factory evidence

Beam saw cutting boards in the OutDo woodwork unit
Beam saw, woodwork unit
Profile edge-banding machine for handleless edges
Profile edge-bander for handleless edges
Six-side CNC drilling machine with an operator
Six-side CNC drilling
Finished furniture packed per project for dispatch
Packed per project, ready for dispatch
ISO 9001:2015Hettich OEM partnerGuinness World Records™ certificate holders
Simple process

How your project moves through OutDo

From your first enquiry to dispatch, every project moves through a defined manufacturing process.

  1. 1

    Enquiry

    Send your layout, BOQ or drawings. We review the requirement and understand what needs to be made.Send your layout, BOQ or drawings. We review what needs to be made.

  2. 2

    Drawing

    Our team develops or reviews the furniture drawings against the project requirement and site information.We review the furniture drawings against the project and site.

  3. 3

    Planning

    Materials, production requirements and project dates are reviewed before manufacturing begins.Materials, production and dates are reviewed before manufacturing.

  4. 4

    Production

    Approved drawings move into machine-led production, with panels identified for the project.Approved drawings move into machine-led production.

  5. 5

    QC

    Furniture is checked before packing and prepared project-wise for dispatch.Checked before packing, prepared project-wise.

  6. 6

    Dispatch

    Dispatch is coordinated with project and site readiness.Coordinated with project and site readiness.

Project lead time is counted from frozen drawings, purchase order and advance.

Your next project

Which part of your next project cannot afford to go wrong?

Pick one. We'll show you how we protect it.

How we protect your timeline

What we do

  • We check whether materials and selections can meet your dates before the order is placed, not after.
  • On big jobs, the laminate mill is asked to hold its production slot before the purchase order.

Evidence

  • Two production lines running two shifts, 7 AM to 2 AM.
  • Project lead time is counted from frozen drawings, purchase order and advance.
Discuss your timeline

How we protect your design

What we do

  • The drawings are checked against the real site and corrected to actual sizes before production.
  • The electrical layout is drawn with the furniture, and switch-plate cutouts are collected at selection.

Evidence

  • Approved drawings drive the machines: cut lists, machine programs and panel labels come from the drawing.
  • PIBM: our desk mock-up was approved at the first attempt.
Discuss your drawings

How we protect your capacity

What we do

  • Wood, metal and aluminium work in one manufacturing setup, so fewer parts wait on another vendor.
  • Approved drawings go straight to the woodwork, metal and aluminium production heads and to procurement.

Evidence

  • About 26,000 sq ft in three units, with two lines and two shifts.
  • NMIET: about 50,000 pieces, made in about 15 days.
Check manufacturing capacity

How we protect your quality

What we do

  • Better material is proposed with a test you can run yourself, and nothing changes without your approval.
  • Furniture is checked before packing.

Evidence

  • NMIET: an HDHMR board sample was kept in water for a day before the management and architect approved it.
  • ISO 9001:2015 certified.
Discuss your specifications

How we protect your installation

What we do

  • Before dispatch, site readiness, lift and labour count are confirmed with the site team.
  • Furniture is packed project-wise, with panels identified for the project.

Evidence

  • A dedicated project manager on every order, from planning to installation.
  • Helmets and safety shoes are kept in our vehicles for MNC sites.
Discuss your site requirements
Start your project

Have a project coming up?

Send your BOQ or drawings, discuss your requirement, or book a factory visit.

Send your BOQ or drawings

Share your BOQ, layout or drawings. We'll review them from a manufacturing perspective and discuss the next step with you.

Book a factory visit

Visit our manufacturing facility near Pune and see the production setup before you decide.

Project enquiry

Tell us about your project. Drawings and BOQs are welcome.

CallWhatsAppDiscuss a project